English Русский
LLC «GIS–Komplekt»
Geophysical Engineering Systems

Calendar

«    October 2021    »
MonTueWedThuFriSatSun
 123
45678910
11121314151617
18192021222324
25262728293031

ISO 9001-2015

qr_rts Company has certified the quality management system for compliance with the requirements of GOST R ISO 9001-2015

Frac Blender on trailer

Designed for preparation of the working compositions for fracturing operations.


Posted by: master |

Frac Blender on KAMAZ-63501 truck chassis

Designed for preparation of the working compositions for fracturing operations.

Posted by: master |

Frac operation control unit based on KamAZ-43118 chassis

Frac operation control unit designed to real-time data collection, monitoring and control all frac processes.


Posted by: master |

Chemical Unit on KamAZ-63501 chassis

is designed for transportation and feeding of chemical liquids of 3-d and 5-th classes of hazard to support frac operations (flammable liquids, liquid mixtures, oxidizing substances and organic peroxides) in special tanks. Utilized for extreme arctic climates

Posted by: master |

Hydration unit on KamAZ-63501 chassis

designed to prepare water-based gel for hydraulic fracturing operations at the wellsite.

Posted by: master |

Pump unit with hydromechanical drive

designed to pump water, water-based gel and other process liquids.

Posted by: master |

Mobile heating unit on KamAZ-43118 truck chassis

Designed for heating technical water during hydraulic fracturing operations in low ambient temperatures.

Posted by: master |

Mobile storage for chemicals liquids (Chemical box)

is designed for storage of process liquids in special tanks and pumping equipment for supply of reagents in various modes during hydraulic fracturing operations.

Posted by: master |

Operator's cabin

is designed to accommodate the control system for hydraulic fracturing operations.

Posted by: master |

Perforating gun loading truck on KamAZ-43118 chassis

Designed for:

  • perforating equipment and explosive materials delivery to the wellsite;
  • temporary storage of explosive materials and perforating equipment;
  • perforating gun loading at the wellsite;
  • perforating crew delivery and rest accommodations.
Posted by: master |